Description

  • Boiler Room (1-4): Address aging heating systems

    Bus Garage (1-7): Repair deteriorating metal walls and sidewalks, add a salt storage barn and fueling station. 

    Woodshop Class (1-4): Improve ventilation

    Restrooms (1-4): Remodel to bring sinks inside restrooms, fix deteriorating conditions

    Culinary Arts Class (1-9): Renovate for more modern uses.

    Music Room (1-XX): Move and renovate secondary school music room.

    Conceptual Renderings (1-3): These renderings of the music room, culinary arts and are not final designs.

    Schools (1-4): Aerial photos of Midlakes schools.