Description

  • Boiler Room (1-4): Address aging heating systems

    Bus Garage (5-11): Repair deteriorating metal walls and sidewalks, add a salt storage barn and fueling station. 

    Woodshop Class (12-15): Improve ventilation

    Restrooms (16-20): Remodel to bring sinks inside restrooms, fix deteriorating conditions

    Culinary Arts Class (21-29): Renovate for more modern uses.

    Music Room (30-32): Move and renovate the secondary school music room.

    Conceptual Renderings (33-35): These renderings of the music room, culinary arts and are not final designs.

    Schools (36-39): Aerial photos of Midlakes schools.